Sunday, May 23, 2010

Picking up again...

Wow - It's hard to believe that it's been over a year and a half since I added a post to this blog. If I have any readers out there, my sincere apologies, and I want to thank you for persevering in following this. If you have just stumbled onto this, then thank you for taking the time to read this. I promise not to take 21 months to put together the next post, and also add some pictures.

Last time I was talking about the history of my railroad, the Maryland and Ohio. I mentioned that I had rebuilt a switching layout that my son had initially designed, and we built together, and I had upgraded to current standards. In addition to relaying the track, I needed an entrance to the area to connect it to the rest of the layout. That was accomplished through the installation of a single slip switch that connected it to the end of a branch line. It is one of two branches that are served by the Maryland and Ohio from the primary Yard that is modeled - a town called Sunday Creek. It is intended to be a small Marshaling yard, with a stub end yard, a turntable and seven stall roundhouse, and the other related engine facilities.

Sunday Creek was the first part of the railroad that had scenery installed, but it is not intended to be an area of great scenic value - after all, what engine terminal can you name that is a scenic attraction? The whole area (engine terminal and yard) is L shaped, with the yard on the long side of the L, and the terminal on the short, bottom leg. For operating interest, the mainline passes by on the long side of the L, and then loops back underneath the yard descending into a hidden track that doubles back under the yard. There is a hidden staging yard underneath that is intended to represent the eastern connections for the railroad - it is referred to as Pittsburgh, but could connect with any eastern area. I have been leaning towards having this be a Pennsylvania RR connection, but have done nothing so far to make this so - no motive power etc.

On the near edge of the bottom side of the L is a mainline connection that is intended to be the outbound connection to the Chesapeake and Ohio. When I designed it, I had the idea of building half of a passenger terminal to face the track, and have the inside completed. This idea is still in my mind, but it will take a lot of detail work to finish. There are 3 tracks here that curve off the end - I would like to extend the track a bit further to allow a reasonable length passenger train to stop here, but the Authorities are frowning on the extension.

The structures at Sunday Creek are perhaps more developed than some other areas. The primary structure is the roundhouse, which is scratch built, and a bit freelanced. The design was intended to look like it "could have" existed - it has a set of upper windows to provide light, and a full framework inside. The sides and back are stone shaped plastic walls that are weathered to look like real stones - I'm sure it's not a perfect job, but I am happy with it. All of the doors and windows are commercial parts - Grandt Line, if I remember correctly. The coaling tower is a Sheepscot wooden structure - an excellent kit if you can still find one. It includes a sanding facility as part of the kit. For water, I built a Tichy 100,000 gallon tank, and lettered it to show the name of the railroad, and the location. I installed a couple of water plugs in the area to provide water to my locos.

There are also some other buildings in the area - a handcar shed, and an oil storage building that were built following C and O plans. There is also a Walthers White Castle to provide food to the roundhouse workers - it's right out the back door. There is also a small used car sales lot, and a water pumping station in the area. I still want to add some living quarters - housing and some backdrops.

OK - that's all for this update. I appreciate any responses you might have, and suggestions/questions you might have. As always, I remain,

The Buckeye Boomer

Sunday, August 31, 2008

Background, Part 2

OK - enough about what is no longer in existence. When my wife and I moved into our current home, it was an opportunity to start over. I was able to save two a couple of sections from the first layout, including the yard that I had built, and a hidden staging yard, both of which I had hand laid. Using these two sections, I designed a new layout that fit into half of a smaller basement.

The original plan was intended to be a double decker layout, with a helix hidden in a mountain in the center of the room. I built the outer sections over the first few years, eventually getting into the center of the room. It was time to start building the helix, but I became more concerned about the double decker format. My lower level is at a low level - approximately 40 inches - just high enough for me to get under without banging my head. The upper level was going to be either too close to the lower level, or too close to the suspended ceiling. That, and the amount of time it was going to take to build the upper level, was enough to make me decide to change my design.

The original design for the helix was planned to be a double track loop, with one loop coming from the lowest point on the layout, and the other loop coming from the main yard. I redesigned this section so that the lower feed became another hidden storage yard. The other yard feed continued around the loop, and connects back into a bridge and completes the loop back. The original mountain area is still there, but is now being developed into a coal mine area. The original helix area was not going to allow much of an area for business development - the new plan allows for the mine, and the addition of a small town that is loosely based on the town of Thurmond, W. Va.

One of things that I was also able to do was incorporate a bookshelf layout that had been designed my my son. The plan was loosely based on the John Allen Timesaver idea. By this point, my son was in college, and was impressed that I wanted to use it. I took the design, which was basically a standalone shelf, extended the ends to give it the capacity to handle a few more cars, and also some industrial potential. It is meant to sit in a valley, and will be the site of at least one, if not two more coal mines. To connect it to the rest of the layout, I turned a regular turnout location into a single slip switch.

The thing that I got the most interest from in both layouts in the early stages was hand laying the track. The track is approximately 90% hand laid; I only used commercial turnouts in three places - a double slip switch that is the throat of the entrance into one town, a set of 4 switches into a crossover, and the last hidden storage yard I built. In the case of the crossover section and the double slip, I like to think it was a case of believing that I could do it, but not seeing the value in trying to do it when Lambert/Shinohara does it better. In the case of the double slip, the amount of adjusting that would have to be done to get a set of points built with 4 rails instead of 2 was more than I wanted to handle. The same was true with the crossover, and the angles and tolerances in the diamond. As for the hidden yard, it was a case of a cost benefit analysis. I looked at the amount of time it would take to build a 4 track hidden yard that could handle up to 8 reasonable length trains, and decided that using cork roadbed, Atlas track and switches, was more than reasonable. Does the product look as good as what I can handlay? Nope. Does it work any better? Probably not. Will anyone see it? NO! So if no one will see it, why spend all of the extra time, when the project is already taking too long?

By the time I had completed the staging yard, and then completed the loops above it, I was getting close to completion of the track laying. At this point I installed the Bookshelf, but before it went in, it had to have an upgrade to bring it up to current track standards. This ultimately led to a replacement of all the rail (it had been code 100, but current standards meant replacing it with weathered code 70. The lengthening of the both ends tended to mandate a change too. I kept the ties for the most part (Campbell profile ties), but I did have to put new ties in for the slip switch, and also the connection to the outside world.

Looks like this post is probably long enough; I have more to tell, including the Engine Terminal, and the scenery work that I have done so far. No, the Maryland and Ohio is not just a collection of track on plywood!

Until next time, I remain,
The Buckeye Boomer

Sunday, August 17, 2008

Let's provide some background

OK. The first post was pretty lame. But then again, I am a newbie to blogging. This one will hopefully be better. Since this is about Model Railroading, let me tell you about mine.

The Maryland and Ohio is an HO scale layout that has been building in four locations now for over 30 years. That sounds like it should be fairly well finished, but unfortunately, that's not the case. I am not a person who can spend many hours each week modeling - in fact there are weeks that go by that I cannot dedicate any time to the M and O at all. That doesn't mean, however, that I am not dedicated to the hobby.

The first M and O was based on a track plan from the Kalmbach book 101 Track Plans. It was intended to be a 16 foot long bookshelf, but I was building this in a spare bedroom in a 2 bedroom apartment, and so had to build it in an L shape, 8 feet long on each side. The track plan had several bridges, and a wharf as part of the two level design. The layout lasted about 5 years, and was moved from Ohio to Connecticut after 2 years. There were several good things about it, along with several things that could have been better. The bridges were interesting - they were wooden, and well built, based on some photos that I had seen in Model Railroader. They were apparently well built, as I still have them today, although they are not in service.

The bad things were about the basic construction, which was a ladder style of 1" x 4" boards. Since I was in an apartment, I couldn't attach to the walls, so it had to sit on the floor. L Girder was not really an option. I also used brass rail - some old snap track, and flex track. The brass rail was a problem, but since it was in an apartment, the oxidation was not much of an issue. The scenery never did get started, but I did have several buildings, and the wharf. The buildings and some of the rolling stock were scratchbuilt - I didn't have any kids yet, and so had a bit more time.

When I finally bought a home, this layout was sacrificed for a new one that was designed for the basement of the new house - a ranch style with a full basement. The design was on the grandiose side, but it was never finished - we lived there about 8 years. This time I wanted to hand lay the track, and so I started from scratch. This was not my first foray into hand laid track - I had belonged to two different clubs and had some good help there, working on both HO and O scale.

As the layout progressed, my work got better, but the size of the layout prevented me from building any real scenery. I did have a fair amount of track down, though, including a hidden staging area, and a reasonable yard, with round table. This layout though came to an end whe we moved to our current house. I was able to save the yard, and also the hidden staging area.

Well, this post is long enough for now. I hope you'll find it improved.

The Buckeye Boomer

PS. Just discovered from the editor that you can't use and ampersand. How lame is that!

Wednesday, July 30, 2008

First Entry

Hello.

I'm not your typical blogger - I'm not 20 something - at least I haven't been for many years. My intent is to start a Blog on my favorite subject - Model Railroading - something I've been into since I was a child.

For now this will be a tease and a place holder - but I will be back to share my thoughts, and also give a status on what I have done so far, and what I intend to do in the future.

Until then, I am the

Buckeye Boomer