Sunday, August 31, 2008

Background, Part 2

OK - enough about what is no longer in existence. When my wife and I moved into our current home, it was an opportunity to start over. I was able to save two a couple of sections from the first layout, including the yard that I had built, and a hidden staging yard, both of which I had hand laid. Using these two sections, I designed a new layout that fit into half of a smaller basement.

The original plan was intended to be a double decker layout, with a helix hidden in a mountain in the center of the room. I built the outer sections over the first few years, eventually getting into the center of the room. It was time to start building the helix, but I became more concerned about the double decker format. My lower level is at a low level - approximately 40 inches - just high enough for me to get under without banging my head. The upper level was going to be either too close to the lower level, or too close to the suspended ceiling. That, and the amount of time it was going to take to build the upper level, was enough to make me decide to change my design.

The original design for the helix was planned to be a double track loop, with one loop coming from the lowest point on the layout, and the other loop coming from the main yard. I redesigned this section so that the lower feed became another hidden storage yard. The other yard feed continued around the loop, and connects back into a bridge and completes the loop back. The original mountain area is still there, but is now being developed into a coal mine area. The original helix area was not going to allow much of an area for business development - the new plan allows for the mine, and the addition of a small town that is loosely based on the town of Thurmond, W. Va.

One of things that I was also able to do was incorporate a bookshelf layout that had been designed my my son. The plan was loosely based on the John Allen Timesaver idea. By this point, my son was in college, and was impressed that I wanted to use it. I took the design, which was basically a standalone shelf, extended the ends to give it the capacity to handle a few more cars, and also some industrial potential. It is meant to sit in a valley, and will be the site of at least one, if not two more coal mines. To connect it to the rest of the layout, I turned a regular turnout location into a single slip switch.

The thing that I got the most interest from in both layouts in the early stages was hand laying the track. The track is approximately 90% hand laid; I only used commercial turnouts in three places - a double slip switch that is the throat of the entrance into one town, a set of 4 switches into a crossover, and the last hidden storage yard I built. In the case of the crossover section and the double slip, I like to think it was a case of believing that I could do it, but not seeing the value in trying to do it when Lambert/Shinohara does it better. In the case of the double slip, the amount of adjusting that would have to be done to get a set of points built with 4 rails instead of 2 was more than I wanted to handle. The same was true with the crossover, and the angles and tolerances in the diamond. As for the hidden yard, it was a case of a cost benefit analysis. I looked at the amount of time it would take to build a 4 track hidden yard that could handle up to 8 reasonable length trains, and decided that using cork roadbed, Atlas track and switches, was more than reasonable. Does the product look as good as what I can handlay? Nope. Does it work any better? Probably not. Will anyone see it? NO! So if no one will see it, why spend all of the extra time, when the project is already taking too long?

By the time I had completed the staging yard, and then completed the loops above it, I was getting close to completion of the track laying. At this point I installed the Bookshelf, but before it went in, it had to have an upgrade to bring it up to current track standards. This ultimately led to a replacement of all the rail (it had been code 100, but current standards meant replacing it with weathered code 70. The lengthening of the both ends tended to mandate a change too. I kept the ties for the most part (Campbell profile ties), but I did have to put new ties in for the slip switch, and also the connection to the outside world.

Looks like this post is probably long enough; I have more to tell, including the Engine Terminal, and the scenery work that I have done so far. No, the Maryland and Ohio is not just a collection of track on plywood!

Until next time, I remain,
The Buckeye Boomer

No comments: